In Utah, onsite wastewater (septic) systems are regulated by Utah Department of Environmental Quality (DEQ), Division of Water Quality, Onsite Wastewater Program, which sets the statewide code, and permits are issued and inspections carried out by county or local health jurisdictions. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.
The state-level regulator is Utah Department of Environmental Quality (DEQ), Division of Water Quality, Onsite Wastewater Program (official program page). The Division of Water Quality runs the statewide certification program and sets standards, but day-to-day permitting, soil evaluations, and inspections are carried out by local health departments (e.g., Salt Lake County, Utah County, Weber-Morgan, and the multi-county district health departments), which issue construction permits for new systems.
The statewide onsite-wastewater code is cited as Utah Administrative Code R317-4 ("Onsite Wastewater Systems"). We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.
The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Utah; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.
| Design | Utah Onsite Wastewater Professional certification, Level 2 (conventional systems) or Level 3 (alternative systems), issued by the Division of Water Quality after training through the Utah Onsite Training Program (Utah State University) and passing an exam. |
|---|---|
| Installation | Utah Onsite Wastewater System Installer license issued by the Utah Division of Occupational and Professional Licensing (DOPL), in addition to the relevant DWQ onsite-professional certification level. |
Septic records in Utah are generally held by the county or local health jurisdiction that issued the permit, not by the state agency, and are released under the state's public records law. We have not logged the specific statute name and response deadline for Utah yet; check with the county office listed on its records page below, or with Utah Department of Environmental Quality (DEQ), Division of Water Quality, Onsite Wastewater Program.
We hold 2,088 septic records across 3 of 29 Utah counties. Each county page below shows exactly where its records are kept and how many we hold.
Full Utah county-by-county index · Open the parcel map
Utah Department of Environmental Quality (DEQ), Division of Water Quality, Onsite Wastewater Program. The Division of Water Quality runs the statewide certification program and sets standards, but day-to-day permitting, soil evaluations, and inspections are carried out by local health departments (e.g., Salt Lake County, Utah County, Weber-Morgan, and the multi-county district health departments), which issue construction permits for new systems.
The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.
Utah Onsite Wastewater System Installer license issued by the Utah Division of Occupational and Professional Licensing (DOPL), in addition to the relevant DWQ onsite-professional certification level.
Septic records are generally held by the county or district health office that issued the permit. See our county-by-county Utah index for the specific office and portal in each county.
Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.