Cashmere is a city in Chelan County, Washington, with 1.2 square miles of land. Generate a free preliminary septic design for a parcel in Cashmere: tank size, treatment, dispersal layout and a PDF spec sheet, sized against the Washington rule set. No sign-in needed.
Open the free design tool for Cashmere Book a demo call
The parcel's lot lines and the mapped soil data we hold for the parcel, together with the Washington rule set. Anything the design had to assume is listed on it, and you can change it.
Who regulates septic here: Chelan-Douglas Health District (neither county code carries an on-site sewage chapter).
These figures come from Chelan County's own regulations, which sit on top of the Washington state code.
Our capture of this rule set is marked for review, so the numbers are not shown until it is re-checked. The citation below is the source.
Source: www.cdhd.wa.gov.
We hold 42 septic and onsite wastewater records for Chelan County. The county's records door we know of is www.cdhd.wa.gov. Requests fall under the Chapter RCW 42.56 (Public Records Act), with a 5 business days response period.
Septic records in Chelan County: where the county keeps them and what we hold.
1 septic company we list for Cashmere, most-reviewed first. Listings come from public business directories; we have not vetted them.
No account or sign-in is needed to generate a design or download the sheet. Optional paid services offered inside the tool are separate from the free design.
Sunnyslope (5 mi) · Wenatchee (9 mi) · Leavenworth (11 mi) · South Wenatchee (12 mi) · Entiat (16 mi) · Manson (28 mi) · Chelan Falls (30 mi) · Chelan (31 mi)
Place type and land area from Census TIGER; housing units from Census population estimates, vintage 2025. Rule and fee figures are quoted from the cited source as we captured them. Page built 2026-11-19.
Yes. Generating a design for a parcel in Cashmere and downloading its PDF sheet costs nothing and needs no account or sign-in.
Cashmere is in Chelan County, Washington. Septic permits there are issued by Chelan-Douglas Health District (neither county code carries an on-site sewage chapter).
No. It is a free preliminary design, a planning draft that is not permit-ready and not stamped. The permit process goes through your local permitting authority, normally with a site and soil evaluation and, where required, plans from a licensed designer or engineer.
Chelan-Douglas Health District (neither county code carries an on-site sewage chapter).
We hold 42 septic and onsite wastewater records for Chelan County. The county records page lists where the county keeps them.