Rice is a city in Navarro County, Texas, with 2.7 square miles of land. Parcels for Rice are not on our map yet, so the free septic design is not available here today. This page holds what we do have for Rice: the septic rules and fees that apply, where the county keeps its septic records, the septic companies we list, and the free design where it already works.
Where the free design works today Ask us to add Rice
Who regulates septic here: Texas Commission on Environmental Quality (TCEQ), On-Site Sewage Facilities program, 30 TAC Chapter 285, administered locally by county Authorized Agents.
These are the Texas statewide requirements. Navarro County may add local requirements on top of them, so confirm with the permitting office before you plan around a number.
| Item | Value |
|---|---|
| Minimum setback from a well | 100 feet |
| Minimum setback from a property line | 5 feet |
| Minimum setback from surface water | 75 feet |
| Minimum lot size | 1 acres |
| Requirements | A soil evaluation is required; the installer must be licensed |
Source: www.tceq.texas.gov (effective 2012-12-27).
We have not yet counted septic records for Navarro County; that is not an estimate of zero.
4 septic companies we list for Rice, most-reviewed first. Listings come from public business directories; we have not vetted them.
More septic companies in Navarro County.
Emhouse (7 mi) · Corsicana (11 mi) · Barry (13 mi) · Retreat (13 mi) · Powell (14 mi) · Oak Valley (15 mi) · Mustang (16 mi) · Blooming Grove (16 mi) · Mildred (17 mi) · Angus (17 mi) · Kerens (18 mi) · Navarro (18 mi)
Place type and land area from Census TIGER; housing units from Census population estimates, vintage 2025. Rule and fee figures are quoted from the cited source as we captured them. Page built 2026-11-19.
Not yet. Parcels for Rice are not on our map, so the generator cannot draw on your lot. The free design works in 18 states today, and you can ask us to add Navarro County.
Rice is in Navarro County, Texas. Septic permits there are issued by Texas Commission on Environmental Quality (TCEQ), On-Site Sewage Facilities program, 30 TAC Chapter 285, administered locally by county Authorized Agents.
At least 100 feet under Texas Commission on Environmental Quality (TCEQ), On-Site Sewage Facilities program, 30 TAC Chapter 285, administered locally by county Authorized Agents. Local conditions and the type of well can require more.
Texas Commission on Environmental Quality (TCEQ), On-Site Sewage Facilities program, 30 TAC Chapter 285, administered locally by county Authorized Agents.