Septic recordsState rules

Septic System Regulations in Wyoming

In Wyoming, onsite wastewater (septic) systems are regulated by Wyoming Department of Environmental Quality (DEQ), Water Quality Division, Water and Wastewater Program, which sets the statewide code; some counties are delegated to issue permits and inspect locally, others are handled directly by the state agency. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.

23
counties
10
with records we hold
4,173
records held statewide

Who regulates septic systems in Wyoming

The state-level regulator is Wyoming Department of Environmental Quality (DEQ), Water Quality Division, Water and Wastewater Program (official program page). DEQ is the direct permitting authority for small wastewater/septic systems (under the Small Wastewater Facility General Permit) in Campbell County (commercial systems only), Carbon, Niobrara, Platte, and Weston Counties. Other counties/jurisdictions have their own designated permitting authority for individual sewage disposal systems, so authority varies by county.

The statewide onsite-wastewater code is cited as Wyoming Water Quality Rules and Regulations, Chapter 25 ("Septic Tanks, Soil Absorption Systems, and Other Small Wastewater Systems"), promulgated under Wyo. Stat. 35-11-103(c)(ix). We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.

The permit sequence

The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Wyoming; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.

  1. Site and soil evaluation. A qualified evaluator (see licensing below) digs test pits or runs a percolation test, and records the soil profile, depth to seasonal water table, depth to any restrictive layer, and slope. This determines whether the lot can support a conventional system or needs an alternative design.
  2. Design. Under most state codes, daily design flow is set from bedroom count, not square footage. That flow drives tank capacity, and the soil evaluation sets the drainfield application rate and therefore its size. The designer also lays out setbacks to wells, property lines, surface water, foundations and a reserve/replacement area.
  3. Permit application. Submitted to whichever office issues permits here (state agency or county/district health office, per the delegation model above), along with the design and soil work.
  4. Installation and open inspection. The installer builds the system, and it is inspected before backfill while it is still open to view.
  5. As-built and approval. A final drawing of what was actually built is filed once the system is approved. That as-built is the document a future owner, pumper or inspector needs, and it is what ends up in the county record.

Who can design and install a septic system

We have not verified the specific licensing regime for Wyoming against an official source. Check with Wyoming Department of Environmental Quality (DEQ), Water Quality Division, Water and Wastewater Program directly.

Getting septic records in Wyoming

Septic records in Wyoming are generally held by the county or local health jurisdiction that issued the permit, not by the state agency, and are released under the state's public records law. We have not logged the specific statute name and response deadline for Wyoming yet; check with the county office listed on its records page below, or with Wyoming Department of Environmental Quality (DEQ), Water Quality Division, Water and Wastewater Program.

Counties in Wyoming we hold records for

We hold 4,173 septic records across 10 of 23 Wyoming counties. Each county page below shows exactly where its records are kept and how many we hold.

CountyRecords held
Natrona4,042
Big Horn52
Park38
Laramie15
Hot Springs7
Teton6
Converse5
Albany5
Uinta2
Campbell1

Full Wyoming county-by-county index · Open the parcel map

Common questions

Who regulates septic systems in Wyoming?

Wyoming Department of Environmental Quality (DEQ), Water Quality Division, Water and Wastewater Program. DEQ is the direct permitting authority for small wastewater/septic systems (under the Small Wastewater Facility General Permit) in Campbell County (commercial systems only), Carbon, Niobrara, Platte, and Weston Counties. Other counties/jurisdictions have their own designated permitting authority for individual sewage disposal systems, so authority varies by county.

What is the septic permit process in Wyoming?

The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.

Who can install a septic system in Wyoming?

Check with Wyoming Department of Environmental Quality (DEQ), Water Quality Division, Water and Wastewater Program, which administers licensing for onsite wastewater installers here.

How do I get septic records for a property in Wyoming?

Septic records are generally held by the county or district health office that issued the permit. See our county-by-county Wyoming index for the specific office and portal in each county.

Sources

Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.