In Vermont, onsite wastewater (septic) systems are regulated by Vermont Department of Environmental Conservation (DEC), Drinking Water and Groundwater Protection Division — Wastewater System and Potable Water Supply (WW) Program, which issues onsite wastewater permits directly. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.
The state-level regulator is Vermont Department of Environmental Conservation (DEC), Drinking Water and Groundwater Protection Division — Wastewater System and Potable Water Supply (WW) Program (official program page). The WW Program issues wastewater system and potable water supply permits directly through five DEC regional offices covering the entire state, for soil-based wastewater systems with flows under 6,500 gallons per day; a small number of municipalities operate under a separate Municipal Delegation arrangement rather than the standard county/local-health model seen in other states.
The statewide onsite-wastewater code is cited as Wastewater System and Potable Water Supply Rules (Vermont Environmental Protection Rules, Chapter 1), rules effective April 12, 2019. We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.
The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Vermont; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.
| Design | A Vermont Licensed Designer is required for all permit applications (homeowner self-design is not accepted): Class A, B, or BW Licensed Designers (non-engineer, licensed via the Secretary of State's Office of Professional Regulation) for systems up to 1,350 gpd, or a Vermont-licensed professional engineer (Class 1) for more complex systems. |
|---|---|
| Installation | Septic system installers are not currently licensed by the State of Vermont; no state installer license or certification is required. |
Septic records in Vermont are generally held by the county or local health jurisdiction that issued the permit, not by the state agency, and are released under the state's public records law. We have not logged the specific statute name and response deadline for Vermont yet; check with the county office listed on its records page below, or with Vermont Department of Environmental Conservation (DEC), Drinking Water and Groundwater Protection Division — Wastewater System and Potable Water Supply (WW) Program.
We hold 425,997 septic records across 14 of 14 Vermont counties. Each county page below shows exactly where its records are kept and how many we hold.
| County | Records held |
|---|---|
| Chittenden | 62,477 |
| Windsor | 46,584 |
| Rutland | 40,926 |
| Windham | 34,784 |
| Orange | 33,119 |
| Washington | 30,731 |
| Caledonia | 29,901 |
| Franklin | 29,605 |
| Orleans | 28,387 |
| Addison | 27,181 |
| Bennington | 25,784 |
| Lamoille | 21,764 |
| Grand Isle | 8,763 |
| Essex | 5,991 |
Full Vermont county-by-county index · Open the parcel map
Vermont Department of Environmental Conservation (DEC), Drinking Water and Groundwater Protection Division — Wastewater System and Potable Water Supply (WW) Program. The WW Program issues wastewater system and potable water supply permits directly through five DEC regional offices covering the entire state, for soil-based wastewater systems with flows under 6,500 gallons per day; a small number of municipalities operate under a separate Municipal Delegation arrangement rather than the standard county/local-health model seen in other states.
The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.
Septic system installers are not currently licensed by the State of Vermont; no state installer license or certification is required.
Septic records are generally held by the county or district health office that issued the permit. See our county-by-county Vermont index for the specific office and portal in each county.
Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.