In Virginia, onsite wastewater (septic) systems are regulated by Virginia Department of Health (VDH), Division of Onsite Water and Wastewater Services (Environmental Health), which sets the statewide code; some counties are delegated to issue permits and inspect locally, others are handled directly by the state agency. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.
The state-level regulator is Virginia Department of Health (VDH), Division of Onsite Water and Wastewater Services (Environmental Health) (official program page). VDH sets statewide sewage handling and disposal regulations and local health districts issue construction permits and inspect systems, but since 2019 permit applications must be accompanied by supporting work (site evaluation, and system design for alternative systems) from a private-sector professional licensed by the Department of Professional and Occupational Regulation (DPOR), with VDH/OSE staff continuing to review that design work.
The statewide onsite-wastewater code is cited as 12VAC5-610 (Sewage Handling and Disposal Regulations) and 12VAC5-613 (Regulations for Alternative Onsite Sewage Systems). We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.
The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Virginia; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.
| Design | Design of conventional and alternative onsite sewage systems is performed by a DPOR-licensed Onsite Soil Evaluator (Conventional/Authorized Onsite Soil Evaluator, or Alternative Onsite Soil Evaluator — journeyman/master levels), licensed by the DPOR Board for Waterworks and Wastewater Works Operators and Onsite Sewage System Professionals; VDH reviews the design. |
|---|---|
| Installation | DPOR-licensed Onsite Sewage System Installer (journeyman or master, conventional or alternative class) — no individual may install a conventional or alternative onsite sewage system without a valid installer license issued by the DPOR Board for Waterworks and Wastewater Works Operators and Onsite Sewage System Professionals. Board page: https://www.dpor.virginia.gov/Boards/WWWOOSSP |
Septic records in Virginia are generally held by the county or local health jurisdiction that issued the permit, not by the state agency, and are released under the state's public records law. We have not logged the specific statute name and response deadline for Virginia yet; check with the county office listed on its records page below, or with Virginia Department of Health (VDH), Division of Onsite Water and Wastewater Services (Environmental Health).
We hold 493 septic records across 2 of 129 Virginia counties. Each county page below shows exactly where its records are kept and how many we hold.
| County | Records held |
|---|---|
| James City | 449 |
| Loudoun | 44 |
Full Virginia county-by-county index · Open the parcel map
Virginia Department of Health (VDH), Division of Onsite Water and Wastewater Services (Environmental Health). VDH sets statewide sewage handling and disposal regulations and local health districts issue construction permits and inspect systems, but since 2019 permit applications must be accompanied by supporting work (site evaluation, and system design for alternative systems) from a private-sector professional licensed by the Department of Professional and Occupational Regulation (DPOR), with VDH/OSE staff continuing to review that design work.
The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.
DPOR-licensed Onsite Sewage System Installer (journeyman or master, conventional or alternative class) — no individual may install a conventional or alternative onsite sewage system without a valid installer license issued by the DPOR Board for Waterworks and Wastewater Works Operators and Onsite Sewage System Professionals. Board page: https://www.dpor.virginia.gov/Boards/WWWOOSSP
Septic records are generally held by the county or district health office that issued the permit. See our county-by-county Virginia index for the specific office and portal in each county.
Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.