In Mississippi, onsite wastewater (septic) systems are regulated by Mississippi State Department of Health (MSDH), Division of On-Site Wastewater, which issues onsite wastewater permits directly. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.
The state-level regulator is Mississippi State Department of Health (MSDH), Division of On-Site Wastewater (official program page). MSDH's Division of On-Site Wastewater directly administers permitting statewide; regional environmentalists (organized into North, Central, and South environmental regions) conduct site/soil evaluations and issue the permit/recommendation, rather than county health departments running independent programs.
The statewide onsite-wastewater code is cited as Individual On-site Wastewater Disposal Law, Miss. Code Ann. ยงยง 41-67-1 through 41-67-41; MSDH "Regulation Governing Individual On-Site Wastewater Disposal Systems". We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.
The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Mississippi; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.
| Design | Certified Professional Evaluator (MSDH-certified) designs on-site wastewater disposal systems; MSDH staff engineers review and authorize CPE-designed systems. |
|---|---|
| Installation | Certified Installer, licensed/certified by MSDH's Division of On-Site Wastewater. |
Records requests in Mississippi are governed by the Mississippi Public Records Act, which sets a response deadline of 7 business days.
Fees: reasonable fees for retrieval/review; agency must provide a fee estimate before charging
We hold 80 septic records across 1 of 82 Mississippi counties. Each county page below shows exactly where its records are kept and how many we hold.
| County | Records held |
|---|---|
| Monroe | 80 |
Full Mississippi county-by-county index · Open the parcel map
Mississippi State Department of Health (MSDH), Division of On-Site Wastewater. MSDH's Division of On-Site Wastewater directly administers permitting statewide; regional environmentalists (organized into North, Central, and South environmental regions) conduct site/soil evaluations and issue the permit/recommendation, rather than county health departments running independent programs.
The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.
Certified Installer, licensed/certified by MSDH's Division of On-Site Wastewater.
Records requests are governed by the Mississippi Public Records Act, with a 7 business-day response deadline. Records themselves are generally filed at the county or district office that issued the permit, not the state agency; see the county's page for that county's specific portal or contact.
Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.