In Idaho, onsite wastewater (septic) systems are regulated by Idaho Department of Environmental Quality (DEQ), which sets the statewide code, and permits are issued and inspections carried out by county or local health jurisdictions. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.
The state-level regulator is Idaho Department of Environmental Quality (DEQ) (official program page). The Idaho Board of Environmental Quality/DEQ sets statewide rules, but Idaho's seven public health districts administer permitting, site evaluations, and inspections under a memorandum of understanding (MOU) with DEQ.
The statewide onsite-wastewater code is cited as IDAPA 58.01.03 - Individual/Subsurface Sewage Disposal Rules and Rules for Cleaning of Septic Tanks. We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.
The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Idaho; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.
| Design | For Large Soil Absorption Systems (LSAS), the design must be prepared by a professional engineer licensed in Idaho. Standard individual/subsurface sewage disposal systems are sited and approved through the local health district's permitting process rather than requiring a separate state design license. |
|---|---|
| Installation | Licensed Basic or Complex Installer (license issued through DEQ/the local public health district), with a homeowner exception allowing an owner to install a standard system on their own property without hired help. |
Septic records in Idaho are generally held by the county or local health jurisdiction that issued the permit, not by the state agency, and are released under the state's public records law. We have not logged the specific statute name and response deadline for Idaho yet; check with the county office listed on its records page below, or with Idaho Department of Environmental Quality (DEQ).
We hold 139,425 septic records across 29 of 44 Idaho counties. Each county page below shows exactly where its records are kept and how many we hold.
| County | Records held |
|---|---|
| Canyon | 26,706 |
| Ada | 15,364 |
| Kootenai | 14,577 |
| Boundary | 12,918 |
| Valley | 7,967 |
| Boise | 6,682 |
| Gem | 6,397 |
| Shoshone | 5,828 |
| Cassia | 4,962 |
| Benewah | 4,423 |
| Lincoln | 4,140 |
| Payette | 4,105 |
| Bonner | 3,978 |
| Owyhee | 3,815 |
| Elmore | 3,785 |
| Washington | 2,282 |
| Gooding | 2,102 |
| Camas | 2,036 |
| Blaine | 1,966 |
| Adams | 1,593 |
| Twin Falls | 1,585 |
| Minidoka | 1,584 |
| Jerome | 520 |
| Bannock | 45 |
| Bonneville | 43 |
| Clearwater | 13 |
| Franklin | 5 |
| Bear Lake | 2 |
| Teton | 2 |
Full Idaho county-by-county index · Open the parcel map
Idaho Department of Environmental Quality (DEQ). The Idaho Board of Environmental Quality/DEQ sets statewide rules, but Idaho's seven public health districts administer permitting, site evaluations, and inspections under a memorandum of understanding (MOU) with DEQ.
The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.
Licensed Basic or Complex Installer (license issued through DEQ/the local public health district), with a homeowner exception allowing an owner to install a standard system on their own property without hired help.
Septic records are generally held by the county or district health office that issued the permit. See our county-by-county Idaho index for the specific office and portal in each county.
Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.