In Alabama, onsite wastewater (septic) systems are regulated by Alabama Department of Public Health (ADPH), Bureau of Environmental Services, Division of Community Environmental Protection — Soil and Onsite Sewage Branch; licensing separately handled by the Alabama Onsite Wastewater Board (AOWB), which sets the statewide code, and permits are issued and inspections carried out by county or local health jurisdictions. Installing, replacing or repairing a septic system here means, in sequence: a site and soil evaluation, a design, a permit application, an inspection while the system is open, and a final as-built record once it is approved.
The state-level regulator is Alabama Department of Public Health (ADPH), Bureau of Environmental Services, Division of Community Environmental Protection — Soil and Onsite Sewage Branch; licensing separately handled by the Alabama Onsite Wastewater Board (AOWB) (official program page). ADPH's Soil and Onsite Sewage Branch coordinates the onsite sewage program and sets statewide rules, but property owners obtain permits for new systems or repairs from their local (county) health department, which carries out permitting, site inspection, and approval. Licensing of installers and other onsite-wastewater professionals statewide is handled by the separate Alabama Onsite Wastewater Board (AOWB), created by statute in 1999.
The statewide onsite-wastewater code is cited as Alabama Administrative Code, Chapter 420-3-1 (State Board of Health Rules, Onsite Sewage and Disposal); Alabama Onsite Wastewater Board authorized under Code of Alabama 1975, Section 34-21A. We link the agency's own page above rather than restating specific numeric requirements from it, since those change by rule revision and by local amendment.
The order of operations is broadly consistent across the country, even though the specific numbers in each step vary by state and often by county. None of the figures below are specific to Alabama; treat this as the shape of the process, and get the actual numbers from the agency linked above or from the county office.
| Design | Site/soil evaluation and system design work can be performed by a professional engineer, professional land surveyor, professional geologist, or professional soil classifier; permit applications (site inspection, soil evaluation, system design) are approved by an AOWB-licensed engineer or a Public Health Environmentalist. |
|---|---|
| Installation | AOWB-licensed installer (Basic Installer or Level I/II Installer license), issued by the Alabama Onsite Wastewater Board, which licenses over 1,200 persons performing onsite wastewater work in Alabama. Board site: https://aowb.alabama.gov/ |
Records requests in Alabama are governed by the Alabama Open Records Act, which sets a response deadline of 15 business days.
Fees: reasonable fee for copies/staff time; discretionary for standard requests, mandatory for time-intensive (>8hr) requests; in-person inspection free
We hold 325 septic records across 12 of 67 Alabama counties. Each county page below shows exactly where its records are kept and how many we hold.
| County | Records held |
|---|---|
| Etowah | 133 |
| Mobile | 87 |
| Jefferson | 26 |
| Montgomery | 16 |
| Dallas | 13 |
| Limestone | 13 |
| Elmore | 11 |
| Baldwin | 9 |
| Shelby | 9 |
| Blount | 6 |
| Tuscaloosa | 1 |
| Marengo | 1 |
Full Alabama county-by-county index · Open the parcel map
Alabama Department of Public Health (ADPH), Bureau of Environmental Services, Division of Community Environmental Protection — Soil and Onsite Sewage Branch; licensing separately handled by the Alabama Onsite Wastewater Board (AOWB). ADPH's Soil and Onsite Sewage Branch coordinates the onsite sewage program and sets statewide rules, but property owners obtain permits for new systems or repairs from their local (county) health department, which carries out permitting, site inspection, and approval. Licensing of installers and other onsite-wastewater professionals statewide is handled by the separate Alabama Onsite Wastewater Board (AOWB), created by statute in 1999.
The sequence is a site and soil evaluation, a design sized from the evaluation and (under most state codes) bedroom count, a permit application, an inspection before backfill, and a final as-built filed once the system is approved. Exact numeric requirements are set by the agency's own code, not restated here.
AOWB-licensed installer (Basic Installer or Level I/II Installer license), issued by the Alabama Onsite Wastewater Board, which licenses over 1,200 persons performing onsite wastewater work in Alabama. Board site: https://aowb.alabama.gov/
Records requests are governed by the Alabama Open Records Act, with a 15 business-day response deadline. Records themselves are generally filed at the county or district office that issued the permit, not the state agency; see the county's page for that county's specific portal or contact.
Regulatory information on this page was researched against official state agency sources and last verified 2026-08-31. It is informational only: the agency linked above is authoritative, and requirements can change. We are not lawyers, not a government body, and not affiliated with, licensed or certified by any agency named on this page.